BDA testing, Florida

How often Florida can require a radio coverage re-test

Florida's statute limits how often the fire marshal can require a new assessment of your building's radio coverage: once every 3 years for high-rises and buildings over 12,000 sq ft, once every 5 years for others, with exceptions. Here is the schedule and what one county asks for at acceptance.

Last verified Updated 2 sourcesChangelog

The entrance of a parking garage under a mid-rise building, with palm trees in the sun.

The schedule in the statute

Florida's fire marshals may require an assessment of a building's interior radio coverage and signal strength, to decide whether it needs a radio enhancement system, but not more often than:

BuildingMost frequent routine assessmentCitation
Existing high-rise buildingOnce every 3 yearsF.S. 633.202(18)(c)2
Existing building over 12,000 total gross square feetOnce every 3 yearsF.S. 633.202(18)(c)2
All other existing buildingsOnce every 5 yearsF.S. 633.202(18)(c)2

Florida re-test limits

How often a Florida fire marshal can require a coverage re-check

  • Existing high-rise: no more than once every 3 years. F.S. 633.202(18)(c)23 years
  • Existing building over 12,000 total gross sq ft: no more than once every 3 years. F.S. 633.202(18)(c)23 years
  • All other existing buildings: no more than once every 5 years. F.S. 633.202(18)(c)25 years
The fire marshal can come sooner when:
  • the building undergoes a Level III alteration or rehabilitation;
  • it undergoes reconstruction;
  • a public safety agency reports its radios failed inside because of poor coverage;
  • the building is found to be an imminent life safety threat to first responders.
F.S. 633.202(18)(c)2a to d
Florida limits routine coverage assessments of existing buildings. These are limits, not a schedule; the annual test is separate.Source: F.S. 633.202(18)(c)2.

When is the next BDA test due?

From the test report or the tag on the equipment.
Building

Most fire codes call for a test every year (IFC 510.6.1); your fire marshal (AHJ) sets the schedule. Free reminders; we never share your details.

When the limit does not apply

The fire marshal may assess sooner if the building undergoes a Level III alteration or rehabilitation, undergoes reconstruction, a public safety agency reports that its radios failed inside the building because of poor signal coverage, or the building is found to be an imminent life safety threat to first responders (F.S. 633.202(18)(c)2a to d).

If a re-test leads to a retrofit

If the fire marshal requires an existing building to retrofit its system after the statutory deadlines, the owner gets at least one year, starting from the notice of code violation (F.S. 633.202(18)(g)). If the county or city changes its public safety radio system in a way that forces changes to existing systems, owners get at least 180 days' notice (F.S. 633.202(18)(f)).

What an acceptance test looks like: Miami-Dade example

Miami-Dade Fire Rescue publishes its process. For the acceptance test the contractor submits:

  • the BDA permit number;
  • commissioning documents;
  • screenshots of the system programming;
  • separate downlink grid maps for its 450 MHz and 800 MHz systems;
  • the FCC registration;
  • a retransmission agreement.

On test day:

  • The installer must be on site for the whole test.
  • The inspection stops if coverage misses 99% of critical areas or 90% of general areas.

Miami-Dade also requires a service contract with runner service that responds within four hours of a trouble signal. Other counties set their own steps; check yours.

A technician tests signal in a parking garage.
Miami-Dade measures garages and elevators too.

What to keep on file

  • Every test or assessment report, with the date and the vendor.
  • The permit and the fire marshal's acceptance letter.
  • The frequency license holder's written consent for the system, which Florida requires for any new system or change (F.S. 633.202(18)(d)).
  • Your service contract, if your county requires one.

Set a free reminder so the next date does not slip. Confirm with your fire marshal (AHJ) before you schedule work.

Binders of building records on an office shelf.
Keep the acceptance report, consent and every annual report together.

Free test reminder

Never miss the next BDA test

Add your building once and we email you before the next test is due. It is free, and setting a reminder never shares your details with an installer. Need a new system or a repair? Ask ERRCSCheck for up to 3 quotes.

Questions people ask

Does Florida law require an annual BDA test?

F.S. 633.202(18) does not set an annual test. Ongoing testing schedules come from the Florida Fire Prevention Code and your local fire marshal, so ask yours what it requires and keep every report.

Can the fire marshal re-test us sooner than 3 years?

Yes, in four cases the statute lists: a Level III alteration or rehabilitation, reconstruction, a public safety agency reporting that its radios failed inside the building because of poor coverage, or the building being found an imminent life safety threat to first responders.

Sources

Primary documents we read for this page. Rules change; confirm with your fire marshal (AHJ).

  1. Florida Statutes 2026, section 633.202, subsection (18), The Florida SenateVerified October 25, 2026 · statute
  2. General Guidelines for the Deployment of Two-Way Radio Communication Enhancement System (BDAs), Miami-Dade County Fire Prevention DivisionVerified October 25, 2026 · ahj document
Set a free test reminder